India's second-generation production-linked incentive framework for advanced chemistry cells has passed the milestone that separates announcement from execution. Ola Electric's Krishnagiri gigafactory, Reliance New Energy's Jamnagar cell line, and Exide's Bengaluru facility are all shipping commercial cells to Indian two-wheeler and passenger vehicle OEMs. The government's disbursement schedule is now tied to verified output rather than headline capacity, and the first tranche has been paid.
Key takeaways
- PLI 2.0 disbursement is tied to verified cell output, not capacity.
- Ola, Reliance and Exide are all shipping commercial cells domestically.
- The two-wheeler OEM base is now the anchor demand.
- Import dependence on Chinese cells has begun to compress.
Why the first tranche matters
The 2021 PLI framework produced capacity announcements without cell shipments. The 2024 rework tied the incentive to measured output, and the design change has delivered.
- Ola Krishnagiri: two-wheeler cell shipments at commercial scale
- Reliance Jamnagar: PV-grade prismatic cells
- Exide Bengaluru: energy storage and two-wheeler
- Anchor demand: domestic OEMs, not export
What the sourcing shift looks like
Two-wheeler cell imports from China have started to compress. The compression is small in absolute terms but is the first meaningful move in a decade.
Where the bottleneck now sits
Cathode active material — India still imports most CAM feedstock. The next PLI extension is expected to target that layer.
What could break the trade
A Chinese cell price cut that undercuts even the subsidized domestic economics.
PLI 2.0 disbursement — first tranche
| Producer | Site | Status |
|---|---|---|
| Ola Electric | Krishnagiri | Shipping |
| Reliance | Jamnagar | Shipping |
| Exide | Bengaluru | Shipping |
| Rajesh Exports | Karnataka | Commissioning |
Output-linked disbursement has done what capacity-linked incentives could not.
Frequently asked questions
Are Indian cells price-competitive with Chinese imports?
With the PLI, yes at two-wheeler grade.
Does this cover PV traction cells?
Beginning to — Reliance is the first credible entrant.
What is the CAM constraint?
Domestic supply of nickel-manganese-cobalt precursor.
The bottom line
India's PLI 2.0 has delivered its first cell shipments. The import compression is small but is the first structural move in the domestic supply chain.






